Other planned actions

Old INQUINOSA factory

  • Characterization of INQUINOSA contaminated infrastructures (2nd phase). Previous step before the elaboration of the demolition design
  • Oxidation and reduction in situ tests for decontaminating wall faces
  • Detailed characterisation of wall faces

 

Bailin landfill

  • New HCH analysis laboratory  (works started in June 2018)